Harim Tower

Designed by
  • Beck Group
Location
  • Seoul, South Korea

HARIM GROUP HEADQUARTERS ENTRANCE HAS A CURVING STAINLESS STEEL FACADE SYSTEM MADE BY ZAHNER.

PHOTO © MIJIE.

CURVED METAL FACADE OF HARIM GROUP HEADQUARTERS IN SEOUL.

PHOTO © MIJIE.

CURVED METAL ‘S’ SHAPE FACADE OF THE HARIM FACADE IN STAINLESS STEEL.

PHOTO © MIJIE.

DETAIL OF THE CURVED STAINLESS STEEL FACADE WITH CUSTOM PERFORATED EMBOSS PANELS.

PHOTO © MIJIE.

PHOTO © MIJIE.

PHOTO © MIJIE.

PHOTO © MIJIE.

PHOTO © MIJIE.

PHOTO © MIJIE.

PHOTO © MIJIE.

PHOTO © MIJIE.

PHOTO © MIJIE.

Products, Systems, and ServicesProducts, Systems, and Services


Zahner Services
Design Assist

Design Assist

Engineering

Engineering

Fabrication

Fabrication

Project DataProject Data

Design

Architect

Key Facts

Address
Nonhyeon-dong, Gangnam District, Seoul, South Korea

Project Description

Harim Group Headquarters in Seoul, Korea

Harim Tower in Gangnam, Seoul is the Beck Group-designed headquarters for the Harim Group company. The building features a Zahner engineered cladding system and custom bumped and perforated stainless steel throughout the interior and exterior.

The Harim Group wanted its new corporate headquarters to reflect its focus on sustainability and caring for its employees and the public. Beck provided a unique design solution which introduced 86,000 SF of mid-rise office tower on a small but high-value site. The project includes a boardroom for Harim Group, high-end restaurants, and a café in addition to a range of office spaces. 

To reduce Korea’s high energy cost and to enhance the indoor air quality, Beck designed an operable window system for natural ventilation, high performance Low-E coated windows, LED light fixtures, building automation system, green roof, rainwater harvesting system and underfloor air distribution system. 

Making the Curved Metal Facade for Harim Group Headquarters

Working under Mijie Industrial Company, Zahner developed a custom ZEPPS feature to produce an ‘S’ shaped recess in the building’s facade. ZEPPS is the Zahner system for developing unique forms and curvatures in metal. The ‘S’ shape for Harim Tower provides a unique aesthetic and design signature for the corporate headquarters. This recessed shape also creates a low pressure zone, facilitating natural ventilation on each of the floors.

The metal system Zahner provided was developed with a deep recess cavity for the lighting system. Zahner engineers introduced a modified ZEPPS hardware component which extended the panels 14″ from the building’ surface while retaining the precision curves.

Working with Well-Light, a Korean lighting design consultant, the team installed more than 10,000 LED lights of 4,000k color temperature which show through the building’s millions of perforations. “We tested several different color temperatures,” says Jay Chung, Director of Korea Operations at Beck Group. ”When we tried 3,000k color temperature lights it looked like the building was on fire. The 4,000k lights ended up giving us the perfect light. Plus they’re energy efficient.”

Detail of the custom perforated emboss used to bump and perf the stainless steel facade.

DETAIL OF THE CUSTOM PERFORATED EMBOSS USED TO BUMP AND PERF THE STAINLESS STEEL FACADE.
PHOTO © MIJIE.NonePHOTO © MIJIE. NonePHOTO © MIJIE.

Recent Projects

Mayfair at the Grove

Mayfair at the Grove

The Ballpark at America First Square

The Ballpark at America First Square

Cincinnati Open Lindner Family Tennis Center

Cincinnati Open Lindner Family Tennis Center

Google Bay View Campus

Google Bay View Campus

James Turrell Skyspace

James Turrell Skyspace

Schwab Residential Center at Stanford Graduate School of Business

Schwab Residential Center at Stanford Graduate School of Business

Scottsdale Civic Center

Scottsdale Civic Center

UT Arlington Cooper Street Bridge

UT Arlington Cooper Street Bridge

Grand Foyer in the Ambassador Building at Embassy Gardens

Grand Foyer in the Ambassador Building at Embassy Gardens

Mount Sinai Medical Center Parking Garage

Mount Sinai Medical Center Parking Garage