Project DataProject Data

Design

Architect

Key Facts

Surface Area
810 SF
Address
2700 Bay Area Blvd, Houston, TX, USA

Project Description

FKP Architects, now a part of CannonDesign, engaged Zahner to create a perforated façade that provides required ventilation on the University of Houston-Clear Lake central power plant extension.

The ImageWall landscape image depicting branches from a large oak tree, which is the predominate tree on the University of Houston-Clear Lake campus, is on the east elevation of the central plant expansion.

This Imagewall application includes panels fabricated from Champagne Anodized Aluminum and features Zahner’s Cross-Seam Perf™ technology. The Drop & Lock™ system was the best hardware solution, with the mullions spanning the height of the openings and panels were easily installed by the University’s preferred installer.

ImageWall installation on the Clear Lake Central Plant building.

ImageWall installation on the Clear Lake Central Plant building.

Photo by Tejas Doshi | ARKO The tree canopy pattern on the ImageWall panels echoes the finish on the building facade and the landscaping nearby.

The tree canopy pattern on the ImageWall panels echoes the finish on the building facade and the landscaping nearby.

Photo by Tejas Doshi | ARKO Cross-Seam Perf™ eliminates unperforated borders around each panel, which can obscure imagery on a large panel grid.

Cross-Seam Perf™ eliminates unperforated borders around each panel, which can obscure imagery on a large panel grid.

Photo by Tejas Doshi | ARKO Zahner's Drop & Lock™ panel hardware was used for mounting the perforated ImageWall panels.

Zahner’s Drop & Lock™ panel hardware was used for mounting the perforated ImageWall panels.

Photo by Tejas Doshi | ARKO The prepared photo, looking up through tree branches, that was used to create the ImageWall perforation layout.

The prepared photo that was used to create the ImageWall perforation layout.

Completed ImageWall installation.

Completed ImageWall installation.

Photo by Tejas Doshi | ARKO

Recent Projects

Mayfair at the Grove

Mayfair at the Grove

The Ballpark at America First Square

The Ballpark at America First Square

Cincinnati Open Lindner Family Tennis Center

Cincinnati Open Lindner Family Tennis Center

Google Bay View Campus

Google Bay View Campus

James Turrell Skyspace

James Turrell Skyspace

Schwab Residential Center at Stanford Graduate School of Business

Schwab Residential Center at Stanford Graduate School of Business

Scottsdale Civic Center

Scottsdale Civic Center

UT Arlington Cooper Street Bridge

UT Arlington Cooper Street Bridge

Grand Foyer in the Ambassador Building at Embassy Gardens

Grand Foyer in the Ambassador Building at Embassy Gardens

Mount Sinai Medical Center Parking Garage

Mount Sinai Medical Center Parking Garage