Kansas City, Missouri

Winds of Aphrodite

Bartle Hall Convention Center Loading Dock Remodel Working with artist Suikang Zhao, Crawford Architects led a redesign of the Bartle Hall Loading Dock to provide both a face-lift and a functionality-lift. The new design features an expanded aluminum screen wall developed by Zahner, offering a uniquely artistic first-impression of downtown Kansas City. The project aluminum...

bartle-hall-garage-dock

The William T. Kemper Painting Studios

William T. Kemper Painting Studios The 34,000 square foot William T. Kemper Painting Studios is a renovation to the existing building used by the painting department at KCAI for over thirty years. The new building was designed by Gastinger Walker Harden, features unique patterning and rich customizations throughout the project. Diamond-shaped preweathered grey zinc panels...

dodge-building-kcai-photo-c-zahner-3895_1-scaled

Standard Parking

Standard Parking Garage at 11th & Oak Designed by George Butler Architects for the Power & Light District of Downtown Kansas City, this is a parking structure’s facade was constructed using stainless steel as well as perforated aluminum surface to allow airflow for an otherwise congested space. The aluminum screen wall was engineered, custom perforated,...

2_standard-parking-facade-2294

St. Teresa’s Lace

Windmoor Center and Chapel of St. Joseph St. Teresa’s Academy Designed by Gould Evans and Associates, The Windmoor Center and Chapel of St. Joseph at St. Teresa’s Academy is a 10,000-square-foot building that houses four high-tech classrooms that transform into a single event space for banquets and the new 150-seat chapel. The building’s distinctive facade...

st-teresas-academy-photo-c-zahner-9679-scaled

Royals Crown

Royals Crown at Kauffman Stadium The new Royals Crown at the Royals Ballpark was designed by Populous in two stages for the Kauffman Stadium. The golden structure was designed to crown the new vertical screen at the stadium, one of the largest screens of its kind in the world. Zahner was responsible for engineering, fabricating, and...

2_kauffman-stadium-crown-c-mike-sinclair